bluehost主机转移至新机房

发表于: sitebuild | 作者: | 日期: 2011/3/15 01:03
标签:

刚看到bluehost邮件,得知今晨 bluehost 进行了一大规模的服务器搬迁,希望国内的访问速度会有所提升。

邮件原文如下:

Dear Bluehost Customer,

Bluehost has completed construction on our new data center expansion, complete with advanced temperature control, custom server racks and dozens of improvements designed to help us provide you with higher quality service. We will be moving all customer servers into the new center over the next few weeks.

This expansion allows us to continue to manage all hardware alongside our Technical Support team and System Administrators, here in Provo, Utah. Our experience has shown that hands-on control over all aspects of your hosting is the best method of ensuring excellence.

The Bluehost System Administrators will physically move your server (containing the hosting account: xxx.com) into the new data center between 9 PM, March 14th and 5 AM March 15th (MDT), during low traffic periods. We will work to ensure you experience as little downtime as possible and, to that end, we will take the opportunity to perform any needed hardware maintenance or upgrades. We expect the process to take 1 to 3 hours.

These changes are a reflection of Bluehost’s continued drive toward security, stability and reliability. If you have any questions, our world-class support representatives will be happy to help. Just call us anytime, toll-free at (888) 401-4678.

简单翻译了一下:

亲爱的 Bluehost 用户:

Bluehost已完成了我们的新数据中心的扩展建设,完成了更先进的温度控制、自定义服务器机架等改进,这些改进可以使我们为您提供更高质量的服务。在未来几周内,我们会将所有的客户的服务器迁入新的数据中心。

扩展建设允许我们的技术支持团队和系统管理员继续管理普罗沃、犹他州的所有硬件。我们的经验表明:手工管理您的主机是确保完美的最好方法。

从3月14日晚上九时至3月15日上午05时的这段时间内,Bluehost系统管理员会将您的服务器转移到新的数据中心。我们会尽量挑选低流量时段,我们将努力确保您的停机时间尽可能短。在转移的过程中,我们将借此机会执行任何所需的硬件维护或升级。我们估计整个过程大概需要1到3小时。

这次升级是Bluehost的对安全性、稳定性和可靠性持续追求的体现。如果您有任何问题,我们一流的支持团队将很乐意提供帮助。任何时间只需拨打我们的免费电话(888)401-4678。

: https://blog.darkmi.com/2011/03/15/1650.html

本文相关评论 - 1条评论都没有呢
Post a comment now » 本文目前不可评论

No comments yet.

Sorry, the comment form is closed at this time.